Product Details:
|
|
Place of Origin: | Shenzhen ,China |
---|---|
Brand Name: | Top-King |
Certification: | ISO9001:2008;RoHS |
Model Number: | AL-39 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 500sets |
Price: | Negotiation |
Packaging Details: | carton 36cm*30cm*16cm |
Delivery Time: | 5-15work days |
Payment Terms: | T/T |
Supply Ability: | 5000sets/day |
Detail Information |
|||
Type: | Plastic Up Part Of Foot Cup | Material: | Aluminum +PVC |
---|---|---|---|
Weight: | 0.027g | Package: | 200 Piece One Caton |
Code: | AL-39 | ||
Highlight: | Aluminum Tubing Joints Claw Mode,AL-39 Lightweight Aluminum Tubing Joints,Foot Cup Aluminum Tubing Connectors |
Product Description
AL-39 Plastic up part of foot cup Outer Connector Aluminum Tubing Joints Claw Mode
Quick Detail:
1. Code:AL-39
2. Surface treatment: Oxidation
3.Material: aluminum + PVC
4. Connecting mode:claw.
5. Technology: die casting
6. Type: Outer connector.
7. Function:To connect aluminum pipe racking system. It can be used flexible on Expansion castor and foot cup.
Detail Description:
1. Aluminum Alloy Pipe joint is used to connect diameter 28mm aluminum pipe to assemble pipe racking ,workstation and other aluminum pipe rack products.
2. It is made of aluminum alloy with oxidation surface treatment, plastic-coated pipe joints is made of iron, which after electrophoresis or chromium plating surface treatment
3. This aluminum alloy joints is used to connect the aluminum alloy pipe. This aluminum alloy joints is putting the pipe inside. It can be 360 degree free rotation
4. Aluminum alloy pipe surface through special processing there is a fixed lines to prevent joints move free in side the pipe, unlike the other pipe have a smooth surface.
5. It is made of aluminum and ADC-12, after dia-casting to be shape, needed to send for doing surface treatment with well wear-resisting and good apperance.
Features:
Item No. | AL-39 |
Name | Plastic up part of foot cup |
Material | Aluminum +PVC |
Technology | Die-casting |
Environment | ROHS compaliant |
Sample | 1 days after confirming |
Package | 250 sets packing in carton(Size:350mm*300mm*160mm) |
Certification | ISO9001:2008;SGS |
Delivery time: | 5-15 working days after received the deposit |
Quality gurantee | If you receive defective items, please email us a picture of the defective part. We will send you replacement without extra charger |
Weight | 56 g/set |
Main Marke | Southeast Asia, Middle East,Africa, South America |
Competitive Advantage:
1. Part delivery
2. Professional team support
3. Our company got the patent to product aluminum alloy pipe rack system in China.We are the only manufacturer to products this products.
4. Free sample for our customer,but need you pay for the freight.
5. Pipe rack products and design solution supplied fast and freely
6. Best design oriented for your special requirements
7. Lifelong technical support
8. Lifelong technical support
9. Concept proposal
10. Standard Design
11. Our company have more than ten year experience in pipe rack system,we have professional experience and professinal team for support our customers.
12. We are a manufacturer of direct sales, can control the quality and price, to sale the high quality and best price forout customers.
Enter Your Message